Kitchen remodeling contractor working on a Houston, Texas home

Kitchen Remodeling in Houston, TX

Not enough counter space, cabinets that don't work, lighting you're tired of fighting — your kitchen has a list that keeps growing. We handle the full kitchen remodel under one written scope, priced before anything comes down.

  • 360 reviews
  • 350+ projects completed
  • Remodeling kitchens since 2015
  • Licensed and insured
  • Serving Houston and Harris County

Kitchen Remodeling Services for Houston's Bungalows and New Builds

HQ Kitchen Remodel works across a metro with two very different kitchens to solve for. In the Heights, that means a century-old wood-frame box sitting on a pier-and-beam foundation. A few miles out, it means a 1950s ranch or a newer slab-built subdivision home. What stays constant is the crew — cabinets, a serious countertop, tile that reaches the ceiling, layered lighting, and the plumbing and electrical work behind all of it, carried under one contract.

Call (323) 689-7945

How Your Kitchen Renovation Gets Sequenced Around Houston's Weather

Order of operations decides whether a project lands on time, and Houston adds a few wrinkles most cities don't. Ours runs like this:

  • Tear-out. Old finishes and fixtures come out and leave the property.
  • Crawlspace and framing check. Pier-and-beam homes get a look underneath before anything closes back up.
  • Rough-in. Water, waste, and circuits move while the walls and floor are open.
  • Drywall. Cabinets cannot sit flat and square against an uneven wall.
  • Cabinets ahead of counters. Fabricators measure the boxes standing in the room, not a drawing.
  • Tile, floors, and fixtures. Paint and hardware close the job out.

Skip a step and the schedule slips, because a countertop cannot be templated until cabinets are installed and level.

Kitchen renovation sequenced for a Houston, Texas pier-and-beam home

What a Kitchen Renovation Quote Has to Spell Out

A quote with gaps is a quote you end up paying for twice. Everything below sits inside ours:

  • Kitchen demolition, including full debris removal.
  • Kitchen cabinets in stock, semi-custom, or custom, plus cabinet refacing where the boxes are worth keeping.
  • Countertops in quartz, quartzite, granite, butcher block, or a solid-surface material.
  • Backsplash tile running from subway to mosaic to a single stone slab.
  • Kitchen flooring in vinyl plank, engineered wood, or porcelain tile.
  • Kitchen lighting built from recessed cans, under-cabinet strips, and pendant layers.
  • Plumbing and electrical upgrade work, including new dedicated circuits and GFCI protection.
  • Kitchen island builds, breakfast bars, and pantry cabinetry.
  • Kitchen appliances set, leveled, and connected.
  • Kitchen design drawings agreed before a single order goes in.

Call (323) 689-7945 for a scope that leaves nothing out.

Call (323) 689-7945
Kitchen cabinets installed as part of a Houston kitchen renovation quote

The Complete Kitchen Makeover Services We Bring to Every Houston Job

Each service below has its own page, and several of them typically run together on one job.

Kitchen Demolition

Safe tear-out and clean removal.

Learn more

Plumbing & Electrical Work

Rough-in, circuits, and fixture connections.

Learn more

Kitchen Cabinets Installation

Set level, scribed, and finished.

Learn more

Kitchen Cabinet Refacing

A lighter path when the boxes are solid.

Learn more

Kitchen Countertops Installation

Templated, fabricated, and fitted.

Learn more

Kitchen Lighting Design & Installation

Layered light that actually works.

Learn more

Kitchen Island Remodel

Added seating, storage, and prep space.

Learn more

Backsplash Installation

Tile from the counter to the ceiling.

Learn more

Kitchen Floor Installation

Hardwood, tile, and vinyl plank.

Learn more

Kitchen Drywall Installation

Taping and finishing after rough-in.

Learn more

Kitchen Appliance Installation

Hookups, venting, and leveling.

Learn more

Pantry Remodel

Storage that fits how you shop.

Learn more

Breakfast Bar Installation

Casual seating built into the plan.

Learn more

Kitchen Design Services

Drawings and selections up front.

Learn more

Small Kitchen Remodeling

Smarter corners and taller storage.

Learn more

Modern Kitchen Remodel

Flat panels, slab surfaces, clean lines.

Learn more

Farmhouse Kitchen Remodel

Warm wood and apron-front sinks.

Learn more

Country Kitchen Remodel

Traditional detail and softer finishes.

Learn more

Eco-Friendly Kitchen Remodeling

Durable, lower-impact materials.

Learn more

Kitchen Remodel Contractor

Full project management start to finish.

Learn more

U-Shaped Kitchen Remodeling

Three-wall layouts with real corner storage.

Learn more

L-Shaped Kitchen Remodeling

Two-wall layouts with an open, flexible room.

Learn more

Condo Kitchen Remodeling

Built around HOA rules and shared plumbing.

Learn more

Kitchen Redesign Services for Bungalows, Ranches, and New Builds

Houston's housing stock is wide enough that "redesign" means something different on almost every street. A few directions come up constantly:

  • Craftsman-true shaker. Simple square panels that suit a Heights bungalow's original trim.
  • Farmhouse. Apron sink, warm wood tones, black hardware.
  • Transitional shaker. The safest upgrade for a 1950s Garden Oaks or Oak Forest ranch.
  • Modern flat-panel. Slab fronts and a waterfall edge for a cleaner line.
  • Small-kitchen plans. Taller uppers and better light where the footprint can't grow.
  • Island-led layouts. Rebuilding or extending the island where the floor plan allows it.

Call (323) 689-7945 to talk through a direction.

Call (323) 689-7945
Custom kitchen redesign options for a Houston home

Cabinets and Countertops for a Kitchen Upgrade That Outlasts Houston Humidity

The two upgrades that change a room the most also carry the most consequence in a Gulf Coast climate. Choose them with the local weather in mind:

  • The box matters more than the door. Plywood construction, soft-close hinges, full-extension glides — not a material that swells in a humid crawlspace.
  • Refacing suits a solid frame. Common in the Heights, where the layout already works and the doors don't.
  • Quartz is the low-maintenance answer. No sealing, no staining, no seasonal wood movement to manage.
  • Granite and quartzite need sealing. Real stone, real variation, worth it for the look.
  • Butcher block wants attention here. Humidity makes routine oiling non-negotiable, not optional.
  • Lead times set the calendar. Semi-custom and custom cabinet orders commonly run eight to sixteen weeks.

Call (323) 689-7945 to have your materials priced.

Call (323) 689-7945
Cabinets and countertops chosen for Houston's Gulf Coast humidity

Hurricane Season Changes When You Should Start a Kitchen Remodel

Houston's hurricane season runs June through November, and the heaviest activity tends to land from mid-August through late September. Once a storm enters the Gulf, crew and material availability tightens fast. Booking three to six months ahead of that window is what keeps your project off a waiting list.

Call (323) 689-7945

The Best Remodeling Company for a Houston Kitchen Project

Picking a tile sample is the easy part. Trusting that the same crew shows up tomorrow is the hard part.

Here is what HQ Kitchen Remodel puts behind that trust, in plain terms:

  • 360 reviews from Houston-area homeowners we've built for.
  • 350+ projects completed since 2015.
  • Licensed and insured, with the scope in writing before anyone picks up a hammer.
  • One named contact who carries the job from the first measurement to the walkthrough.

Nothing gets built before it is written down, priced, and approved by you, and we are equally upfront about the slow stretches, including the weeks your countertop spends at the fabricator.

Call (323) 689-7945 and measure us against any other bid you get.

Call (323) 689-7945

What Actually Moves Kitchen Reno Cost in Houston

Kitchen reno cost tracks the decisions you make in the first week, and the gap between a refresh and a full rebuild is wide. A few moves keep it in check:

  • Leave the plumbing where it sits. No relocated sink or range means no expensive surprises.
  • Reface square, solid boxes. New doors and hardware carry most of the visible change.
  • Split your materials. Quartz on the main run with a simpler island keeps the total sane.
  • Phase the project. Cabinets and counters now, flooring or lighting in a later round.
  • Lock in selections early. Late swaps are what turn a firm number into a moving target.

We hand you a firm written price after measuring, so you can compare bids on identical information.

Why Houston Heights Bungalows Remodel on Their Own Terms

Houston Heights, Woodland Heights, and Norhill were mostly built out from the 1890s through the 1930s, and the standard house is a wood-frame craftsman bungalow sitting on a pier-and-beam foundation over a crawlspace — often with only eighteen to twenty-four inches of clearance underneath. That crawlspace was Houston's original flood strategy, lifting the living floor above grade, but Gulf Coast humidity collects down there year-round. Left unmanaged, it drives wood movement, racked door frames, and slow rot at the sill plate.

A few miles north, Garden Oaks and Oak Forest are a different build entirely. Think 1940s and 1950s cottages and ranch homes, most on a slab instead of pier-and-beam. The issues there run more conventional — dated wiring, an undersized panel, a closed-off floor plan — but the same Harris County rule applies to both: roughly thirty percent of the city sits inside a mapped floodplain, which can add a floodplain development permit on top of the plumbing, electrical, and structural permits a real kitchen remodel already needs.

How Our Kitchen Remodel Process Works

Every job runs the same eight steps:

  1. 1Consultation. We see the room and ask how you actually cook in it.
  2. 2Measure and design. Drawings, layout choices, and a materials list.
  3. 3Written scope and price. Firm numbers once we have measured.
  4. 4Permits. Filed and inspected, floodplain paperwork included where it applies.
  5. 5Demolition and rough-in. Noisy, dusty, and kept as short as possible.
  6. 6Cabinets and countertops. Boxes leveled, then stone templated and set.
  7. 7Floors, tile, and finish. Lighting, appliances, paint, hardware.
  8. 8Walkthrough and punch list. Every small item closed before we leave.

What Demolition Turns Up in an Older Houston Kitchen

Tear-out day tells you what's really behind the cabinets, and in this city it follows a pattern:

  • Galvanized or cast-iron supply and waste lines that push a plumbing upgrade onto the table.
  • Cloth-wrapped or knob-and-tube wiring feeding a panel that was never sized for today's appliances.
  • Soft or damp subfloor near the sink wall, usually traced back to a slow leak nobody had found yet.
  • A sill plate showing moisture damage where a pier-and-beam crawlspace has been trapping humidity for decades.
  • An undersized island or no island at all, common in kitchens built before open-plan living was standard.
  • Single-pane windows or a soffit hiding old ductwork, both of which change what the cabinet layout can do.

Anything unexpected becomes a written change order with your sign-off, photographed as we find it.

Call (323) 689-7945 about anything you've already spotted.

Call (323) 689-7945

The Houston Neighborhoods We Cover for Kitchen Projects

We cover 77007, 77008, 77009, 77018, and 77092, and the streets around them. Past that radius, our kitchen remodeling specialists across Texas can step in.

ZIP codes7700777008770097701877092

Houston Heights

and its side streets of original craftsman bungalows.

Woodland Heights

and Norhill, just east of the Heights.

Garden Oaks

and Oak Forest, a few miles north on slab-built ranch lots.

Call (323) 689-7945 to confirm coverage at your address.

Call (323) 689-7945

Frequently Asked Questions

How long does a full kitchen remodel take in Houston?

On-site work for a full job typically runs eight to sixteen weeks. Tear-out takes days; cabinets and countertops take weeks, and lead times drive the calendar harder than labor does.

Why do two kitchen remodel bids come in so far apart?

Cabinet tier, countertop material, how much plumbing and wiring moves, and the appliance package. An unusually low bid usually signals cheaper materials or unpermitted work.

Is cabinet refacing worth it, or should the boxes come out?

Often refacing is the smarter move if the frames are square and solid. If they're warped, water-damaged, or held together with staples, replacement wins instead.

Do we need a permit for a kitchen remodel?

Cosmetic swaps in the same footprint usually don't need one. Moving plumbing, adding circuits, or touching structure does, and we file that paperwork ourselves.

Do you handle pier-and-beam kitchens in Houston Heights?

Yes, regularly. We check the crawlspace and sill plate condition before we price the job, since that's what decides how much extra work is really involved.

Does Harris County require a floodplain permit for a kitchen remodel?

It depends on whether your address sits inside a mapped floodplain, which covers roughly thirty percent of the city. We check this during the scoping visit and file it when it applies.

Do you work in Garden Oaks and Oak Forest?

Yes, along with Woodland Heights and Norhill. Give us the address and we'll confirm coverage before the first visit is booked.

How does hurricane season affect a Houston kitchen project?

It can, mainly through availability. Booking three to six months ahead of June keeps you off the waitlist that forms once a storm enters the Gulf.

Get Your Houston Kitchen Remodel Scheduled

Call us today. We measure the room, note what your foundation and floodplain status mean for permitting, and hand you a written price with a start date attached. You commit to nothing until both of those are in your hands.

Call (323) 689-7945